Friday 12 February 2010








WG Retro Bags - Retro bags now in store, all of these cool bags are officially liscenesed products. Loads more to browse, Top Cat, Flintstones, Hong Kong Phooey. Why not take online.

JD BUG Scooters



JD BUG Scooters
JD BUG original and pro series kick scooters now in store at Reload Clothing.
The JD Bug has to be the most popular folding kick scooter in the UK, although it has a higher retail price than some other scooters on the market this is without doubt the best made quality scooter out there. The JD Bug Scooter (Model MS-130B) is constructed from Aircraft Grade T6 Aluminium for strength and performance, weighs just 2.7 Kg, and has a maximum rider weight of 100kg. Features include: • Single Action Folding / Unfolding System • Original Fully Patented System • Abec 5 Chrome Bearings with Plate Shields Fully Sealed and Greased • 100mm / 86A Semi Clear Wheels • Rear Wheel Guard / Spring Loaded Braking System • Built In Shoulder Strap • Multi Mount Clip for Carrying Your Accessories • New Aluminium Matt Finish • 80S Grip Tape with JD Bug Logo for Firm Footing.
As always these scooters are delivered FREE OF CHARGE, to have a look log onto www.reloadclothing.co.uk



DC Shoes Spring Summer 2010
The DC Shoes Spring Summer 2010 range is now in store, we have had the first stock delivery with 2 pairs of shoes from the core skate range. We also have more shoes and more clothing on the way, it should be online and in the high street store within the next couple of weeks.

















Lichfield Skatepark Update

LICHFIELD SKATEPARK UPDATE 12/02/2010

On Tuesday 9th Feb 2010 a representative from Reload Clothing sat on the Lichfield skate park meeting at the Lichfield District Council buildings.
To put it in a nutshell, the council have agreed there will be a skate park and the designated site is going to be the circus area of Beacon park.
The skate park will cover an area not exceeding 1500m square and include street and transition features and landscaping.
The sticking points seem to be budget and timescale. The council wanted to get things moving with a budget of £300,000 to include landscaping, this proved to be a sticking point, with the LSA (Lichfield Skate park Association) aiming there sights a little higher, the LSA wanted to agree a budget of £400,000 to include landscaping and have the skate park built in two stages as and when the funds became available.
To put this into perspective the Burton skate park cost somewhere in the region of £100,000.
As yet the funding has not been secured, it would have to come from various sources such as Sport England, Big Lottery Fund and number of other Trusts and Foundations.

The proposed timetable for the project is as follows:
  • Design Completion and fee quotation return deadline: 31 March 2010
  • Design Team Appointment: 1 May 2010
  • Deadline for supply of consultation material for discussion with local residents: 1 Sept 2010
  • Deadline for submission of planning application: 1 Nov 2010
  • Construction Start date: 1 April 2011

The project timetable has slipped back a year due to the regeneration of Beacon park by the Historic Parks project, please note that this is a separate project with a separate budget and does not incorporate the Skate park.

If you have any queries drop into Reload Clothing at 33 Bore St, Lichfield

Tuesday 2 February 2010

Reload Mag

Reload Mag launched Jan 2010

We have launched an online magazine called Reload Mag to compliment the website. At the moment we have started to e-mail a monthly newsletter and the plan is to update the online magazine and e-mail you a link so you can keep track of whats happening in store. We also aim to cover music, entertainment, sports and fashion, the mag is still under construction and there are still alot of articles to upload.
We will keep you updated with progress!

http://www.reloadmag.co.uk/